HEARTH RECOVERY – AN EXPERIENCE WITH USIMINAS BLAST FURNACE#1

25 Sept 2018, 14:30
20m
Room A - Maria Theresia (Schloss Schönbrunn)

Room A - Maria Theresia

Schloss Schönbrunn

Schloss Schönbrunn, Apothekertrakt, Vienna
Oral Presentation Blast furnace ironmaking Blast furnace ironmaking

Speaker

Mrs BEATRIZ FAUSTA GANDRA (USIMINAS)

Description

In 2008, after the Blast Furnace#1 shut down, was identified an abnormal phenomenon in its hearth which required great team effort for proper recovery of the refractory and resumption of operation. At the time, it was aimed to extend the campaign in five years. In this paper, it is described the general aspects of the equipment, the situation in his hearth, actions taken and the current hearth's condition, after further shut down due to the worsening economic crisis in Brazil. As main conclusions: (i) the abnormal condition found in the Blast Furnace#1's hearth was not associated with the refractories' quality, that had preserved their properties; (ii) the repair done, in order to extend the blast furnace campaign in five years, was extremely efficient; and (iii) the Blast Furnace#1's operation between 2010 and 2015 was properly done contributing to the preservation of the hearth, which did not show brick’s wear in that period.

Author

Co-authors

Presentation materials