-
Dr Yury Kapelyushin (South Ural State National Research University)27/09/2018, 08:30Direct reductionOral PresentationAbstract An existing scheme of vanadium production from low-titanium magnetite concentrates is energy-consuming and associated with loss of valuable elements, e.g. titanium. The present work investigates the possibility of obtaining products, which are different from the processing using the conventional technological scheme, for further development of an energy-efficient and wasteless...Go to contribution page
-
Mr Mahdi Farahani (ArcelorMittal.USA)27/09/2018, 08:50Direct reductionOral PresentationThis article presents a novel experimental procedure that simulates the complicated counter-current DR shaft process. This lab test is recently developed in ArcelorMittal Global R&D and shows good correlation with actual direct reduction process. The method provides a unique tool to study the impact of DR plant operation parameters in the laboratory scale, and enables the study of raw...Go to contribution page
-
Mr Kazuto NISHIHIRO (Department of Materials Process Engineering, Graduate School of Engineering, Kyushu University, Japan)27/09/2018, 09:10Direct reductionOral PresentationCO-H2 mixture gas is often used for gas-based DRI process where carbon deposition reaction and Fe3C metal dusting play serious roles for a stable reduction operation. Fe3C decomposition leads to the formation of iron particles which is a catalyst for carbon fiber deposition. Because of the parallel occurrence of these reactions, kinetic analysis of them would...Go to contribution page
-
Mr Ao Zhang (Robinson Research Institute, Victoria University of Wellington)27/09/2018, 09:30Direct reductionOral PresentationIronsand is a potential cheap source of iron with possible other values such as titania and vanadium oxide. Direct reduction is regarded as one of the promising processes to deal with ironsand in both an economically and environmentally sustainable manner. In this study, the reduction characteristics of pelletised ironsand ore by hydrogen gas were investigated. The pelletising and sintering of...Go to contribution page
-
Dr Lei Guo (University of Science and Technology Beijing)27/09/2018, 10:20Direct reductionOral PresentationDue to the very fast reduction rate and its possibility to get rid of coke and other technical advantages the flash reduction iron making process has drawn a lot of concern by many experts and scholars in recent years. According to relative literatures, the derivative process of flash reduction of iron ore is analyzed. The development of the flash reduction iron making process at home and...Go to contribution page
-
Dario Pauluzzi (Danieli & Officine Meccaniche)27/09/2018, 10:40Direct reductionOral PresentationCompared to the traditional Blast Furnace – Basic Oxygen Furnace way of producing steel, more than 50% of CO2 emissions can saved if steel is produced by means of the Energiron Direct Reduction – Electric Arc Furnace way. This target is achieved partly thanks to the use of reducing sources cleaner than coal, and partly thanks to the selective capture of up to 90% of the CO2 produced, that can...Go to contribution page
-
Prof. Marc Hölling (Hamburg University of Applied Science, Dept. of Process Engineering)27/09/2018, 11:00Direct reductionOral PresentationThe future of the European steel industry demands solutions for carbon free production routes to fulfil the challenging goals of today‘s climate policies. In terms of CO2-emissions, the reduction process is the most relevant process – be it in a blast furnace or in a direct reduction plant. One solution to this issue could be the transition from fossil-based to hydrogen-based reduction of iron...Go to contribution page
-
Mr Robert Millner (Primetals Technologies Austria GmbH)27/09/2018, 11:20Direct reductionOral PresentationMidrex and Primetals Technologies have successfully completed their latest HBI projects for voestalpine Texas LLC/USA and LGOK/Russia. This paper discusses some further possibilities for improvements of Direct reduction plants in order to increase the plant competitiveness and/or flexibility. Such plant improvements have been either already implemented in the latest projects for the first...Go to contribution page
Choose timezone
Your profile timezone: