In 1995, Krivorozhstal (now ArcelorMittal Kryvyi Rih) awarded a contract for the
supply of a Pulverized Coal Injection System to Hoogovens Technical Services (now Danieli
Corus). Due to economic conditions, the project could not be completed at the time. In 2015,
the project was revitalized by ArcelorMittal Kryvyi Rih and the system was completed by
Danieli Corus. This article discusses the installation, commissioning and ramp-up of the PCI
system for Ukraine's largest Blast Furnace (5000 m³). It covers the refurbishment of the
equipment, which had been kept in storage locally for nearly 20 years. The process and its
changes with the introduction of coal injection is discussed in depth. The article briefly
presents the chosen injection technology, which is based on the basic physical principle of
equal pressure drop across all injection lines.