THE HIGHS AND LOWS OF THE FOURTH CAMPAIGN OF REDCAR BLAST FURNACE, SSI UK, APRIL 2012 – SEPTEMBER 2015

13 Sept 2016, 10:45
20m
Room C (Design Center Linz)

Room C

Design Center Linz

Board: 98
Oral Presentation Blast Furnace, Operation and Control Blast Furnace, Operation and Control

Speaker

PETER WARREN (Materials Processing Institute)

Description

During the short 179 week 4th campaign of Redcar blast furnace, persistent cash constraints led to a number of compromises concerning the limits of raw material quality and composition, particularly for high PCI rate operation. At the modest productivity required, high coke quality enabled low fuel rate, high PCI operation at a relatively high lump ore proportion. Poor quality coke led to a number of severe process upsets.

Authors

DAVE FISHER (BRITISH STEEL) PETER WARREN (Materials Processing Institute)