21–23 Nov 2018
Wirtschaftskammer Österreich
Europe/Vienna timezone
Registration is closed!

Session

Postprocessing (II)

23 Nov 2018, 11:00
Julius Raab Saal (Wirtschaftskammer Österreich)

Julius Raab Saal

Wirtschaftskammer Österreich

Wiedner Hauptstraße 63 1045 Vienna, Austria

Conveners

Postprocessing (II)

  • Michael Kitzmantel (RHP-Technology GmbH)

Presentation materials

There are no materials yet.

  1. Mr Markus Hatzenbichler (FOTEC)
    23/11/2018, 11:00
    Postprocessing
    Oral Presentation
    It is commonly known that the additive manufacturing (AM) technology provides various advantages, such as the production of highly complex (bionic) structures that cannot be realized conventionally, the unused raw material can be recycled and no specific tools are needed. On the economical side, also the lead time saving must be taken into account. Within this project, the surface roughness of...
    Go to contribution page
  2. Mr Quentin Portella (ICD-LASMIS/University of Technology of Troyes)
    23/11/2018, 11:20
    Postprocessing
    Oral Presentation
    Selective Laser Melting (SLM) is a metal additive manufacturing process widely used in industry for its extraordinary versatility to geometry and minimum waste of material. Mechanical properties of SLM objects depend strongly on the process parameters such as power, scanning speed, hatch space and scanning strategy. Working on these latter parameters, the material can be porous or...
    Go to contribution page
  3. Ms Stephanie Thie (Bohrt) (Department of Industrial Furnaces and Heat Engineering of RWTH Aachen University)
    23/11/2018, 11:40
    Postprocessing
    Oral Presentation
    Producing additive manufactured parts often includes post processing in a hot-isostatic press (HIP) and heat treatment. This process usually requires a long cooling and reheating time, which results in a long occupancy of the machinery with a high energy consumption. To reduce the required time and costs, a new process has been designed to reduce the process time and increase the operational...
    Go to contribution page
Building timetable...