21–23 Nov 2018
Wirtschaftskammer Österreich
Europe/Vienna timezone
Registration is closed!

Session

Application (II)

22 Nov 2018, 16:00
Julius Raab Saal (Wirtschaftskammer Österreich)

Julius Raab Saal

Wirtschaftskammer Österreich

Wiedner Hauptstraße 63 1045 Vienna, Austria

Conveners

Application (II)

  • Claudia Rosenkranz (Fraunhofer-Einrichtung für Gießerei-, Composite- und Verarbeitungstechnik IGCV)

Presentation materials

There are no materials yet.

  1. Mr Gerhard Panzl (Montanuniversitaet Leoben)
    22/11/2018, 16:00
    Application
    Oral Presentation
    Metal additive manufacturing (AM) processes like laser powder bed fusion (L-PBF) become a more and more frequently used fabrication method for complex shaped and highly functional metal parts in medical, aerospace and automotive industries. The feedstock used for these processes is atomized, spherically shaped metal powder which has to meet the highest requirements to ensure stability of the...
    Go to contribution page
  2. Prof. Nader Asnafi (Örebro University)
    22/11/2018, 16:20
    Application
    Oral Presentation
    This paper summarizes the current position of 3D metal printing/additive manufacturing (henceforth called 3D metal printing) from an industrial perspective. The new possibilities to design the part differently simply because the new shape can be produced and which provides benefits with respect to improved material utilization degree, reduced weight, size etc. are addressed in this paper....
    Go to contribution page
  3. Mr Kameshwaran Swaminathan (Technip FMC)
    22/11/2018, 16:40
    Application
    Oral Presentation
    Metal additive manufacturing (Metal AM) is a promising technology that can radically disrupt the conventional supply chain methodologies with a "make to order" approach for components in all sizes. This technology promises to disrupt conventional supply chain models without compromising on complexity in part design. Powder Bed Fusion (PBF) and Wire+Arc Additive Manufacturing (WAAM) are two...
    Go to contribution page
Building timetable...