BOF blowing process challenges for high rate of iron ore pellet addition - Process development and results at TKCSA

29 Jun 2017, 11:00
20m
Room K2

Room K2

Oral Presentation Steelmaking: Oxigen Steelmaking Oxygen Steelmaking

Speaker

Mr Daniel Carvalho (thyssenkrupp CSA)

Description

At thyssenkruppCSA, a positive heat balance at BOF process is faced, mainly because of low utilization of scrap and plant design. A singular logistic concept for hot metal transport between blast furnace and steel plant was stablished to optimize handling, transport and energy. An average addition of 75kg of iron ore pellets/t steel is necessary for the BOF-340t heat balance. In order to accomplish this challenge in a stable blowing process, intensive operational development have been successfully done: slopping rate reduction of 86% achieved without changing the blowing time. This paper describes the steps and results of this development.

Author

Mr Daniel Carvalho (thyssenkrupp CSA)

Co-authors

Dr Breno Totti Maia (LUMAR) Herbert Castro (thyssenkrupp CSA) Mr Leonardo Demuner (thyssenkrupp CSA) Mr Marcos Viana (thyssenkrupp CSA) Pavel Wojnar (Primetals) Roberto Formage (thyssenkrupp CSA)