Speaker
Mr
Daniel Carvalho
(thyssenkrupp CSA)
Description
At thyssenkruppCSA, a positive heat balance at BOF process is faced, mainly because of low utilization of scrap and plant design. A singular logistic concept for hot metal transport between blast furnace and steel plant was stablished to optimize handling, transport and energy. An average addition of 75kg of iron ore pellets/t steel is necessary for the BOF-340t heat balance. In order to accomplish this challenge in a stable blowing process, intensive operational development have been successfully done: slopping rate reduction of 86% achieved without changing the blowing time. This paper describes the steps and results of this development.
Author
Mr
Daniel Carvalho
(thyssenkrupp CSA)
Co-authors
Dr
Breno Totti Maia
(LUMAR)
Herbert Castro
(thyssenkrupp CSA)
Mr
Leonardo Demuner
(thyssenkrupp CSA)
Mr
Marcos Viana
(thyssenkrupp CSA)
Pavel Wojnar
(Primetals)
Roberto Formage
(thyssenkrupp CSA)