Commissioning and first operation results of world largest voestalpine Texas Midrex HBI Plant

27 Jun 2017, 08:50
20m
Room G1

Room G1

Oral Presentation Ironmaking: New Ironmaking Technologies New Ironmaking Technologies

Speaker

Mr Robert Milner (Primetals Technologies Austria GmbH)

Description

After a short decision making process voestalpine Stahl Linz decided in June 2013 about their largest foreign investment project for the installation of a 2.0 MTPY Midrex HBI plant in Corpus Christi, Texas/USA. A consortium of Primetals USA LLC and Midrex Technologies was awarded for the supply of Equipment, Engineering and Technical Services of the Direct Reduction plant as green-field project. The Midrex plant which consists of a 7.15 meter reduction shaft and a 20-bay reformer has an annual production capacity of 2,000,000 tons. The hot briquetting system is equipped with a hot fines recycling system. The cooling of HBI is done by cooling conveyors. The produced HBI with an average metallization degree of 93% and 1.5% carbon content will be shipped to voestalpine’s steelworks in Austria and sold to the North American market. After current commissioning activities including integrated plant tests and dry-out the Midrex plant will be started up in the third quarter of 2016. This presentation will cover the main commissioning steps and the first operation results of the world largest HBI plant.

Author

Mr Wolfgang Sterrer (Primetals Technologies Austria GmbH)

Co-authors

Mr Christopher Harris (voestalpine Texas LLC) Mr Garcia Sibaja Suriel (voestalpine Texas LLC) Mr Hanspeter Ofner (Primetals Technologies Austria GmbH) Mr Robert Milner (Primetals Technologies Austria GmbH) Mr Robert Steiner (voestalpine Texas LLC) Mr Victor Romo (voestalpine Texas LLC)